Installation overview, Verify component connector polarity – Enterasys Networks 9033348-02 User Manual

Page 36

Advertising
background image

Installation Overview

3-2 Antenna Installation

Installation Overview

The installation process is summarized in the following steps. The following sections in this
chapter provide additional details.

1.

Make sure the Access Points are mounted and configured as specified in

Chapter 2

.

2.

Check the cable connectors to verify that they are the correct polarity for your
installation.

3.

Plan and implement a grounding system that meets local electrical codes and safety
standards.

4.

Install the RoamAbout Lightning Protector.

5.

Provide and install an antenna support structure as necessary. Make sure that the
support structure is connected to the grounding system.

6.

Connect the exposed metal connectors of the low-loss antenna cable to the grounding
system.

7.

Mount the antenna to the support structure.

8.

Connect the antenna cables.

9.

Route and connect the low-loss antenna cable to the RoamAbout Lightning Protector.

10. Connect the cable assembly from the RoamAbout PC Card in the Access Point to the

Lightning Protector.

11. Run the Access Point Manager Link Test program to aim the antenna and verify

optimal placement.

12. After verifying that the communications link is fully operational, secure all cables and

use weatherproofing tape to seal all outdoor connectors.

Verify Component Connector Polarity

Before you start the antenna installation, refer to

Figure 3-1

to verify that the polarity of

each connector is correct for your installation. The components supplied with your outdoor
antenna kit are configured with either Standard-N connectors or Reverse Polarity-N
connectors, subject to the country where the kit was purchased.

Advertising