Secure the projector ceiling mount to the ceiling, Installation — stage one, cont’d – Extron electronic PoleVault Systems PVS 400 User Manual

Page 18

Advertising
background image

PoleVault Systems Installation • Installation — Stage 1

2-6

Installation — Stage One, cont’d

6. Secure the Projector Ceiling Mount

to the ceiling

a.

Attach the four turnbuckles to the mounting plate, one at

each corner.

C

DO NOT rest or lean on the mounting plate or

suspended ceiling when attaching turnbuckles,
tie wire, or when drilling into the ceiling

N

For safest installation, insert the turnbuckle from

the outside so that it hooks inwards.

b.

Mark and drill holes at 10 degrees out from vertical.

Drill a fifth hole directly centered above the PCM 240 for

the safety cable.

c.

Install appropriate anchors or lag eye-bolts for the

structural ceiling into each drilled hole

d.

Cut four equal lengths of the supplied hanging wire, and

loop the wire through the anchors or eye screws, and the

turnbuckles, then twist the wire around itself at least five

times tightly.

e.

Hand tighten the turnbuckles, and level the plate so it

just rests on the grid.

C

The four hanging wires should be taut, taking

the full weight of the completed installation.

Do not overtighten the turnbuckles or the

T-bar assembly could be lifted, making the

suspended ceiling bowed and unsafe.

f.

Tighten the four T-bar securing screws on the PCM 240.

g.

Mark a point in the ceiling directly above the plate’s

center, drill a hole and install a ceiling anchor or eye

screw

C

DO NOT rest or lean on the plate or
suspended ceiling grid during
installation of safety cable, or during
installation and wiring of electrical
boxes, accessories, and projector.

6a

Attach turnbuckles at the corners

PCM

T-bar

Adjust the turnbuckles to take
up any slack in the hanging wire.

6e

Tighten the turnbuckles

6b

Mark structural ceiling for lag bolt

installation

Advertising
This manual is related to the following products: