Install the screen – Extron electronic PoleVault Systems PVS 400 User Manual

Page 19

Advertising
background image

2-7

PoleVault Systems Installation • Installation — Stage 1

T

Install any optional power outlets in the 2 gang opening

on the mounting plate, towards the outside edge of the
mount, so it does not interfere with the PMK 450 when
installed.

C

For safety, all wiring of the electrical boxes and

accessories should be completed after the plate is
fully installed and secure.

7. Install the Screen

a.

Following the screen manufacturers guidelines, continue

to install the screen mounting brackets and then hang the

screen.

T

Use S-hooks to hang the screen from the brackets.

Bend the ends of the S-hooks so the screen does not fall
when it is rolled up.

PMK 450

T-bar

PCM 240
(viewed from
above)

Install power outlet
in the 2-gang cutout
(RACO box installed)

T

Power outlet installation on the

PCM 240

h.

Pass the safety cable through the anchor and attach it to

the center holes on either side of the plate. Ensure the

cable is of equal length on both sides of the anchor and

secure the cable using the cable clamps.

Attach the safety cable to the PCM

Attach safety cable
to center holes and
secure with cable
clamps.

6i