Secure speakers to structural ceiling, Cable the speakers, Installation — stage three, cont’d – Extron electronic PoleVault Systems PVS 400 User Manual

Page 30

Advertising
background image

PoleVault Systems Installation • Installation — Stage 3

2-18

Installation — Stage Three, cont’d

e.

Loosen the four screws on the front baffle (counter

clockwise) 1/2 turn (see figure, A) and turn the doglegs

to lock onto the C-ring. Tighten down the front screws
(see figure, B).

T

Use a handheld screwdriver, as a powered screwdriver

may slip and damage the speaker.

f.

Repeat steps a through e for each speaker that is to be

installed.

3. Secure speakers to structural ceiling

a.

Replace each tile and speaker on the T-bar frame

b.

Bend down the V-rail tabs to hold it in place and give

added support.

c.

Drill a hole into the structural ceiling and install a lag eye

bolt at a suitable location over the speaker.

d.

Attach a hanging wire to the speaker seismic tab.

4. Cable the speakers

a.

Cut the included speaker cable (SPK 18) to length and

run the cable from the PVS 204SA to the first speaker in

the speaker system being installed.

b.

If not using conduit, insert a ½" clamp into the terminal

(plenum) cover knockout and pass the cable through the

knockout. Clamp the cable or conduit to the cover.

A

B

2e

Turn and lock down the four dog legs

on the C-ring

3b

Replace tile and bend V-rail tabs down

Attach the Conduit or Cable
to the Terminal Cover

Mark, drill a hole, and insert a lag
eyebolt in the structural ceiling.

Attach hanging wire
to the speaker
(seismic tab) and
to the eye bolt.

3c

Attach hanging cable to seismic tab

4b

Attach conduit to terminal cover

Advertising