Installation overview, Preparing the routing template, Installation – Extron electronic HSA 822 User Manual

Page 8

Advertising
background image

HSA 822 Hideaway

®

Enclosure • Installation

HSA 822 Hideaway

®

Enclosure • Installation

Installation

2-3

Preparing the Routing Template

Extron provides a metal routing template for the HSA 822 at no
charge. The HSA 822 template is part #70-191-01. Extron
recommends using this template as a guide to cut the hole in the
table where the HSA will be installed.

The metal routing template is reusable. Do not discard
this template when the installation is complete. Save it
for future HSA 822 installations.

1

.

Cut 1/2" x 4" strips of soft, finished lumber long enough to
span the distance between the desired installation location
on the table or other mounting surface and the edges of
the table (figure 2-1).

Mounting
Surface
Edge

Mounting
Surface
Edge

Wood Thickness
0.5" / 1.3 cm

Width of Mounting Surf

ace

Routing Template

Wood Strip
Height
4" / 10.2 cm

Minimum
4 Screws

Wood
Strips

Figure 2-1 — Prepared routing template

These strips raise the routing template above the mounting
surface to provide room for the router’s collar, protect the
mounting surface, and extend the reach of the routing
template so that it can be clamped to the edge of the
surface.

2

.

Using four or more short wood screws, secure the routing
template to the lumber strips.

CAUTION

Do not allow the wood screws to protrude through
the bottom of the wooden strips. Protruding screws
will mar the table when the template is used.

Installation Overview

Install and set up the HSA 822 as follows:

1

If desired, install the optional RJ-45 to RJ-11 conversion
kit(s) to replace one or more RJ-45 connectors with RJ-11
connectors. Refer to the RJ-45 to RJ-11 Conversion Kit
manual.

2

If desired, install the optional flexible conduit kit to
replace the removable AC power cord. Refer to the
Flexible Conduit Kit manual.

3

If you have an unprepared mounting template, prepare
the template. See “Preparing the Routing Template” on
the next page.

4

Cut a hole in the surface where the enclosure will be
installed and install the enclosure. The clamshell, a
clamping and protective device, clamps the enclosure to
the table. See “Preparing the Table and Mounting the
Enclosure” on page 2-4.

5

Run all cables necessary to support the AC and
RJ-45 connectors and all planned AAP connectors. Leave
enough slack in the cables to connect them to the
underside of the enclosure or to the rear of the AAPs
before the AAPs are installed in the enclosure.

6

Turn off all of the equipment to be connected. Ensure that
the equipment connected to the RJ-45 connectors and the
connections for any AAPs are all turned off and
disconnected from the power source.

7

If applicable, connect cables to the rear connectors on the
AAPs to be installed in the HSA 822. Install the desired
AAPs on the AAP panel of the enclosure. See “Cabling
and Installing the AAPs” on page 2-8.

8

Connect the power and RJ-45 cables to the underside of
the enclosure. See “Cabling the Enclosure” on page 2-10.

9

Route and secure the AAP cables inside the clamshell.
See “Routing the AAP Cables” on page 2-12.

10

If present, peel the protective coating from the top surface.

11

Connect power cords and turn on the devices that connect
to the surface access enclosure.

2-2

Advertising