Installation and assembly – MCZ Kasai User Manual

Page 17

Advertising
background image

Chapter 4

USE AND MAINTENANCE MANUAL

page

17

Installation and assembly

Technical dept. - All rights reserved by MCZ GROUP S.p.A. - Reproduction

prohibited

4. INSTALLATION AND ASSEMBLY

IMPORTANT!
The stove must be installed and connected to the flue

pipe by a specialised technician or by competent

staff so that all local or national regulations are

complied with and in all cases in accordance with the

provisions of standard UNI 10683 REV.


When you unwrap the stove and related frame, make sure that

every part is in perfect working order or check for any damage

due to transport. If the stove is installed in a difficult to access place,

the weight can be lightened by removing the internal elements making

up the combustion chamber. We recommend you reposition each

element correctly.

4.1. PREPARATION AND UNPACKING

The Kasai stove is delivered with three different packagings:

 one contains the stove (fig.2)
 one contains the metal sides fig.3 pieces “6-7-8-9”
 one contains the metal top fig.4 pieces “1-2-3-4-5”

Open the package and remove the two brackets that secure the stove

to the pallet (fig.1).
Remove the two screws (A) from the bracket at the bottom right and

left of the stove.
Then remove the other three screws (B) securing the bracket to the

pallet and position the stove in the chosen location, making sure it

complies with the applicable provisions.

A

A

B

B

B

STAFFA




Figure 2 - Kasai stove packaging

Figure 4 - Kasai stove ceramic packaging

Figure 1 - Removing the packaging

screws (Kasai stove)

Figure 3 - Kasai stove sides packaging

BRACKET

Advertising
This manual is related to the following products: