Installation procedure – Rose Electronics RackView 20 User Manual

Page 7

Advertising
background image

Page 7 KVM Rack Drawer 20” WWW.ROSE.COM

Installation Procedure

1.1 Hardware Kit Contents

1. Rail with front and rear bracket x 2

2.

Screws (length = 6mm) x 6

3.

Keys x 2

1.2 Console Installation Steps

1.

Adjust the rail until 2 screws appear. Loose (but don’t release) the two rear screws then adjust the

depth of the rear bracket to fit your cabinet.

Advertising