Start-up and maintenance documentation – Energy Tech Laboratories MR212 User Manual

Page 28

Advertising
background image

May 2008 Rev. 11

28

Start-Up and Maintenance Documentation

START-UP AND MEASUREMENTS SHOULD BE PERFORMED AFTER THE SYSTEM HAS BEEN
AIR BALANCED AND WITH THE HEAT ON (Warranty will be void without completion of this form)

Job Information

Job Name

Service Company

Address

Address

City

City

State

State

Zip

Zip

Phone Number

Phone Number

Fax Number

Fax Number

Contact

Contact

Purchase Date

Start-Up Date

Heater Information

Refer to the start-up procedure in this manual to complete this section.
Name Plate and Unit Information

Field Measured Information

Model Number

Motor Voltage

Serial Number

Motor Amperage**

Motor Volts

RPM

Motor Hertz

Burner Differential Pressure

in. w.c.

Motor Phase

Pilot Flame Signal

VDC

Motor FLA

Low Fire Flame Signal

VDC

Motor HP

High Fire Flame Signal

VDC

Blower Pulley

Gas Type

Motor Pulley

High Fire Inlet Gas Pressure

in. w.c.

Belt Number

Low Fire Manifold Gas Pressure

in. w.c.

Gas Type

High Fire Manifold Gas Pressure

in. w.c.

Min. Btu/Hr

Thermostat Set-Point

Max. Btu/Hr

Temperature Control

Discharge

Space

Airflow Direction

Correct

Incorrect

**

If measured amps exceed the FLA rating on the nameplate, fan RPM must be reduced to decrease the

measured amps below the nameplate FLA rating.

Maintenance Record

Date Service

Performed

Factory Service Department

Phone: 1-866-784-6900

Fax: 1-919-554-9374

Maxitrol 14

amplifier

Airflow
Switch

Advertising