Attach the fiber labeled 2 to the applicable tr, At the other end of the fiber optic cable, atta, Attach the fiber labeled 2 to the receive port – Enterasys Networks BRIM-E6 User Manual

Page 23: Check that the epim’s lnk led is on. if the led, A. check that the power is turned on for the devic, B. verify proper “receive to transmit” connection, C. verify that the fiber connection meets the db l, 3 connecting a thin-net segment to an epim-c, Set the internal termination switch to the righ

Advertising
background image

CONNECTING THE BRIM TO THE NETWORK

BRIM-E6 USER’S GUIDE

Page 17

3. Attach the fiber labeled 2 to the applicable transmit port labeled TX,

on the module.

4. At the other end of the fiber optic cable, attach the fiber labeled 1 to

the transmit port of the device.

5. Attach the fiber labeled 2 to the receive port.

6. Check that the EPIM’s LNK LED is on. If the LED is not on, perform

the following steps until it is:

a.

Check that the power is turned on for the device at the other
end of the link.

b.

Verify proper “receive to transmit” connection of fiber strands
between the applicable port on the module and the fiber optic
device at the other end of the fiber optic link segment.

c.

Verify that the fiber connection meets the dB loss specifications
outlined in Appendix B.

If a link still has not been established, contact Cabletron Systems
Technical Support.

3.1.3

Connecting a Thin-Net Segment to an EPIM-C

To connect a thin-net segment to an EPIM-C, refer to Figure 3-3 and
perform the following steps:

1. Set the Internal Termination Switch to the right of the port and labeled

TERM to:

The on position (•) if the thin-net segment connected directly to the

port will be internally terminated at the port.

The off position (o) if the thin-net segment will not be terminated at

the port or externally terminated.

Advertising