Empire Comfort Systems VFD36FB2DF-1 User Manual

Page 11

Advertising
background image

Page 11

23200-0-1206

Completion of Air Kit installation

1. Determine the length of 4” Dia. rigid or flex duct connector

(installer supplied) you will need from the firebox/fireplace

to the exterior surface of the outside wall, where the air kit

hood will be installed. Add a few extra inches to the length

to allow for easier attachment of the outside duct connection

prior to securing the outside rain cap hood to the building.

2. Secure the 4” dia. duct to the Air Door assembly collar on the

firebox/fireplace with band clamps or screws.

3. Run the other end of the duct through the exterior wall cut-

out.

4. From the outside of the building, connect the duct to the

collar on the outside air vent assembly with band clamp or

screws to secure.

5. Mate the outside rain cap hood over the air vent, seal with

caulk as necessary, then secure with screws provided to the

exterior wall surface. See Figure 22 and 23.

6. Figure 24 illustrates the various options for installation of the

air duct run possibilities.

OUTSIDE
HOOD

4” DIA. AIR DUCT
CONNECTOR
(INSTALLER SUPPLIED)

OUTSIDE PLATE/VENT
SCREEN ASSEMBLY

AIR DOOR
ASSEMBLY

FIREBOX OR
FIREPLACE

Figure 22

Figure 23

Caulk and Install Duct Termination

WALL

DUCT TERMINATION

RAIN CAP

CAULKING

Figure 24

Advertising