Sensor Installation: F-Series

17

Wiring

Figure 13

Applying the heat shrink

g. Position gland clamping insert so the interior end is flush with the heat shrink.

h. Fold the cloth shield or braid and drain wires over the clamping insert and approximately 1/8 inch

(3 mm) past the O-ring.

Figure 14

Folding the cloth shield

i. Install the gland body into the core processor housing conduit opening.

Figure 15

Gland body and core processor housing

5. Insert the wires through the gland body and assemble the gland by tightening the gland nut. If desired,

leave sufficient wire length inside the core processor housing to allow the housing to rotate without
damaging the wires.

6. Identify the wires in the 4-wire cable. The 4-wire cable supplied by Micro Motion consists of one pair

of 18 AWG (0,80 mm

2

) wires (red and black), which should be used for the VDC connection, and one

pair of 22 AWG (0,35 mm

2

) wire (green and white), which should be used for the RS-485 connection.

Connect the four wires to the numbered slots on the core processor (Figure 16).