1. Cut a rectangular wall opening 37-1/2” (953 mm) W x

37-3/4” H (959 mm) and 4-1/2” (114 mm) above the

floor line (see Figure 7). The dimensions are required

to obtain proper rim and bubbler heights for

compliance with ANSI standard A117.1.

2. Reinforce the wall opening on all sides to adequately

support the water fountain. This reinforcement must

support up to 150 lbs. static load and provide a

means for securing the frame assembly in place.
NOTE: Building construction must allow for

adequate air flow on both sides and top of

remote chiller unit a minimum of 4” (102

mm) is required.

3. Install plumbing and electrical rough-ins. A junction

box for a (3) wire, 10 amp branch circuit is provided on

the inside of the chiller. (Standard 120 Volts, 60 Hz,

and single phase.)

4. Remove frames and related hardware from

packaging. Release the two shelf rods by cutting

cable ties. Attach the two frames together through the

upright supports with (4) 5/16” x 3/4” (19 mm) long

bolts and nuts (not provided). Tighten securely.

REVERSED CONFIGURATION:

HIGHER UNIT ON THE RIGHT

MAKE SURE FRAME CONFIGURATION MATCHES

THE COOLER TO BE INSTALLED

STANDARD CONFIGURATION:

HIGHER UNIT ON THE LEFT

Advertising
This manual is related to the following products: