8

OVLERQ*C OVLSRQ*C OVLESRQ*F OVLSERQ*F

97793C - 10/01

5. Install fountain: Remove access cover plate on

underside of fountains and SAVE the screws. Mount

the fountains to the upper panel and frame with

(4) 5/16” x 3/4” (19mm) long bolts and nuts provided.

Tighten securely.

6. Remove elbow from end of p-trap and attach it to

drain tube. Re-attach elbow to p-trap and cut waste

tube to required length using plumbing hardware and

trap as a guide.

7. Make connection between remote chiller outlet tube

and fountain strainer. Insert the water inlet line into

inlet side of strainer by pushing it in until it reaches a

positive stop, approximately 3/4” (19mm). Turn on

water supply and check for leaks.

REQUIRED TOOLS AND MATERIALS

These tables show special tools and/or additional

materials (not provided) which are necessary to complete

installation of these units:

Special Tools

Item

Description

Quantity

NONE

Additional Materials

Item

Description

Quantity

1

Unplated copper inlet pipe

2

Service St

op

OVL-II ER-Q/SR-Q/SER-Q/ESR-Q INSTALLATION

1. Assemble and place frame in wall as shown on

preceding pages.

2. Install chiller: Remove front panel of chiller. Remove

and discard cardboard inner pack from between

compressor and side panel. Slide chiller onto the

shelf and position it to the left within the guides on the

shelf.

NOTE: Building construction must allow for

adequate air flow on both sides, top and

back of chiller. A minimum of 4” (102mm) on

both sides and top is required. See chiller

installation for additional instructions.

3. Make water supply connections: Attach an unplated

copper water inlet line and a service stop (not

provided) to the chiller. Inlet port is marked on the

chiller (3/8” O.D. copper tube). Bend the copper tube

(provided) at an appropriate length from the chiller to

opening in frame. Install a 3/8” O.D. tube tee fitting

(provided) on the marked chiller outlet port. Turn on

the water supply and flush the line thoroughly.

4. Hang the upper panel on the mounting frame

hanger: Align holes in the panel with the holes in the

mounting frame. Be sure that panel is engaged with

hanger at top of frame before releasing it.

Note: With OVL-II SER-Q or OVL-II ESR-Q models, the

standard reach fountain must be mounted at the

upper position on panel.

Figure 12 – Chiller Installation

Figure 14 – Fountain Installation

Figure 13 – Upper Panel Installation