F. Install Metal Roof Flashing

• See minimum vent heights for various pitched roofs

(Figure 8.11) to determine the length of pipe to extend
through the roof.

• Slide the roof fl ashing over the pipe sections extending

through the roof as shown in Figure 8.12.

Roof Pitch H (Min.) Ft.
Flat to 6/12........................................ 1.0*
Over 6/12 to 7/12 ............................ 1.25*
Over 7/12 to 8/12 .............................. 1.5*
Over 8/12 to 9/12 .............................. 2.0*
Over 9/12 to 10/12 ............................. 2.5
Over 10/12 to 11/12 ......................... 3.25
Over 11/12 to 12/12 ........................... 4.0
Over 12/12 to 14/12 ........................... 5.0
Over 14/12 to 16/12 ........................... 6.0
Over 16/12 to 18/12 ........................... 7.0
Over 18/12 to 20/12 ........................... 7.5
Over 20/12 to 21/12 ........................... 8.0

* 3 foot minimum in snow regions

Figure 8.11 Minimum Height From Roof To Lowest Discharge

Opening

HORIZONTAL

OVERHANG

VERTICAL

WALL

GAS DIRECT VENT
TERMINATION CAP

12

X

ROOF PITCH

IS X/ 12

LOWEST

DISCHARGE

OPENING

2 FT.

MIN.

20 INCHES MIN.

H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING

Figure 8.12

G. Assemble and Install Storm Collar

CAUTION! Risk of Cuts, Abrasions or Flying Debris.
Wear protective gloves and safety glasses during
installation. Sheet metal edges are sharp.

• Connect both halves of the storm collar with two screws

(see Figure 8.13).

• Wrap the storm collar around the exposed pipe section

closest to the roof and align brackets. Insert a bolt
(provided) through the brackets and tighten the nut to
complete the storm collar assembly. Make sure the collar
is tight against the pipe section.

• Slide the assembled storm collar down the pipe section

until it rests on the roof fl ashing (see Figure 8.14).

• Caulk around the top of the storm collar (see Figure 8.15).

Figure 8.13 Assembling the Storm Collar

Figure 8.13 Assembling the Storm Collar

Figure 8.14 Assembling the Storm Collar Around the Pipe

Figure 8.14 Assembling the Storm Collar Around the Pipe

NOTICE: Failure to properly caulk the roof fl ashing and
pipe seams may permit entry of water.

• Caulk the gap between the roof fl ashing and the outside

diameter of the pipe.

• Caulk the perimeter of the fl ashing where it contacts the

roof surface. See Figure 8.12.

• Caulk the overlap seam of any exposed pipe sections

that are located above the roof line.