Hoshizaki KM-320MAH User Manual

Page 38

Advertising
background image

38

6) Braze the new expansion valve, with nitrogen gas flowing at a pressure of 3 to 4 PSIG.

WARNING

1. Do not heat the wall. Place a steel barrier for protection.
2. Always protect the valve body by using a damp cloth to prevent the valve

from overheating. Do not braze with the valve body exceeding 250°F
(121°C).

7) Install a new drier.
8) Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.
9) Evacuate the system and charge it with refrigerant. See the nameplate for the required

refrigerant charge.

10) Attach the bulb to the suction line in position. Be sure to secure it with clamps and to

insulate it.

11) Place the new set of expansion valve covers in position.
12) Replace the panels in their correct positions.
13) Turn on the power supply.

F. Removal and Replacement of Hot Gas Valve and Line Valve

CAUTION

Always use a copper tube of the same diameter and length when replacing the
hot gas lines; otherwise the performance may be reduced.

IMPORTANT

Always install a new drier every time the sealed refrigeration system is opened.
Do not replace the drier until after all other repair or replacement has been
made.

1) Turn off the power supply.
2) Remove the panels.
3) Recover the refrigerant and store it in an approved container.
4) Remove the screw and the solenoid.
5) Disconnect the hot gas valve or line valve using brazing equipment.
6) Install the new valve.

WARNING

Always protect the valve body by using a damp cloth to prevent the valve from
overheating. Do not braze with the valve body exceeding 250°F (121°C).

Advertising
This manual is related to the following products: