Heat & Glo • Everest • 750-900 Rev. L • 1/06

9

3

Installing the Fireplace

Step 1. Locating the Fireplace

The diagram below shows space and clearance require-
ments for locating a fireplace within a room.

A

B

C

D

E

35 1/2”

21 3/4”

30 1/2”

43 1/4”

61 3/16”

(902mm)

(552mm) (775mm)

(1099mm) (1554mm)

Minimum Clearances

from the Fireplace to Combustible Materials

Inches

mm

Glass Front ........................ 36 .............. 914
Floor

............................ 0 ................. 0

Rear

........................... 1/2 ............... 13

Sides

........................... 1/2 ............... 13

Top

......................... 4 1/2 ............ 114

Ceiling*

........................... 31 .............. 787

Figure 2. Fireplace Dimensions, Locations,
and Space Requirements

Clearance Requirements

The top, back, and sides of the fireplace are defined by
stand-offs. The minimum clearance to a perpendicular wall
extending past the face of the fireplace is 4 inches (102mm).
The back of the fireplace may be recessed 23 (584mm)
inches (546mm) into combustible construction.

Framing should be
constructed of 2 X 4
lumber or heavier.

A. ..... 35 1/8” (892mm)

B. ..... 50 1/2” (1283mm)

C. ..... 21 3/8” (542mm)

D. ..... 55 1/2” (1372mm)

Figure 3.

Framing Dimensions

For minimum clearances, see the direct vent termination
clearance diagrams on pages 20 and 21 in this manual.

The distance from the unit to combustible construction
is to be measured from the unit outer wrap surface to
the combustible construction, NOT from the screw
heads that secure the unit together.

Step 2. Framing the Fireplace

Fireplace framing can be built before or after the fireplace is
set in place. Framing should be positioned to accommo-
date wall coverings and fireplace facing material. The dia-
gram below shows framing reference dimensions.

CAUTION: MEASURE FIREPLACE DIMENSIONS, AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS, BEFORE FRAMING.

Minimum Clearances

from the Vent Pipe to Combustible Materials

Inches

mm

Vertical Sections. ............. 1 ................ 25

Horizontal Sections
Top ..................................... 3 ................ 75
Bottom ............................... 1 ................ 25
Sides ................................. 1 ................ 25

At Wall Firestops
Top ..................................... 3 ................ 76
Bottom ............................... 1 ................ 25
Sides ................................. 1 ................ 25

A

B

4” (102mm)

D

C

E

1/2” (13mm)

Shows center of

10” x 12” vent framing

holes for venting.

C

B

A

D

* The clearance to the ceiling is measured from the

top of the unit, excluding the stand-offs and collar.
See Figure 24 for further details.

(Center of 12 x 10)