Refrigerant piping work – haier AU282XHERA User Manual

Page 12

Advertising
background image

10

Refrigerant piping work

Forced fastening without careful centering may damage the threads and cause a

leakage of gas.

Pipe Diameter ( )

Fastening Torque

Liquid Side 6.35mm (1/4'')

18N.m

Gas Side 9.52mm (3/8'')

50N.m

3. Attaching Drain-Elbow

If the drain-elbow is used, please attach it as figure.

Flare nut

Half union

Torque wrench

Spanner

Liquid pipe

Gas pipe

6.35mm ( 1/4'' ) x 0.8mm

9.52mm ( 3/8'' ) x 0.8mm

2. Connection of pipe

Apply refrigerant oil on half union and flare nut.

To bend a pipe, give the roundness as large as possible not to crush the pipe.

Connecting the pipe of gas side firstly makes working easier.

1. Selection of pipe

To this unit, both liquid and gas pipes shall be insulated as they become low temperature in operation.

Use optional parts for piping set or pipes covered with equivalent insulation material.