Purging method: to use vacuum pump – haier AU282XHERA User Manual

Page 14

Advertising
background image

12

In case of gas leakage, tighten

parts of pipe connection. If

leakage stops, then proceed 6

steps.

9.52mm

(3/8")

6.35mm

(1/4")

9.52mm

(3/8")

6.35mm

(1/4")

9.52mm

(3/8")

9.52mm

(3/8")

6.35mm

(1/4")

6.35mm

(1/4")

To indoor unit C

To indoor unit D

To indoor unit B

2 way valve

3 way valve

To indoor unit A

3 way valve

2 way valve

3 way valve

2 way valve

3 way valve

2 way valve

Purging method: to use vacuum pump

2 way valve

3 way valve

90

0

Service port

90

0

for 6 sec.

6 .Detach the charge hose from the service port, open 2-

way valve and 3-way. Turn the valve rod anticlockwise

until hitting lightly.

Liquid stop valve

2 way valve

3 way valve

Gas stop valve

Gauge maifold(R410A)

Vacuum pump(R410A)

Open

Close

2 way valve

3 way valve

6

6

2 way valve

3 way valve

Valve rod cap

Valve rod cap

Service port cap

1 .Detach the service portis cap of 3-way valve, the valve

rod's cap for 2-way valve and 3-way valves, connect the

service port into the projection of charge hose (low) for

gaugemanifold. Then connect the projection of charge

hose (center) for gaugemanifold into vacuum pump.

2 .Open the handle at low in gaugemanifold, operate

vacuum pump. If the scale-moves of gause (low) reach

vacuum condition in a moment, check 1 again.

3 .Vacuumize for over 15min. And check the level gauge

which should read -0.1MPa (-76 cm Hg) at low pressure

side. After the completion of vacuumizing, close the

handle 'Lo' in the vacuum pump. Check the condition of

the scale and hold it for 1-2min. If the scale-moves back

in spite of tightening, make flaring work again, then

return to the beginning of 3 .

4 .Open the valve rod for the 2-way valve to and an angle

of anticlockwise 90 degree. After 6 seconds, close the 2-

way valve and make the inspection of gas leakge.

5 .No gas leakage?

If it does not stop gas leakage, discharge

whole refrigerants from the service port.

After flaring work again and vacuumize,

fill up prescribed refrigerant from the gas

cylinder.

7 .To prevent the gas leakage, turn the service ports cap,

the valve rodis cap for 2-way valve and 3-way's a little

more than the point where the torque increases suddenly.

CAUTION: If the refrigerant of the air conditioner leaks,

it is necessary to make all the refrigerant out. Vacuumize

first, then charge the liquid refrigerant into air conditioner

according to the amount marked on the name plate.

8 .Take the same steps from 1 to 7 for each ways to

ensure a completely vacuum for the whole system.

Advertising
This manual is related to the following products: