Refrigerant piping work – haier AU282XHERA User Manual

Page 13

Advertising
background image

11

4.Cutting and Flaring work of piping

Pipe cutting is carried out with a pipe cutter and burs must be removed.

After inserting the flare nut, flaring work is carried out.

Less than 5cm

It becomes high midway.

The end is immersed in
water

It waves.

It gap with the ground
ts too small.

There is the bad smell
from a ditch.

Please pour water in the drain pan of the indoor unit, and confirm that drainage is carried out serely

to outdoor.

In case that the attached drain hose is in a room, please apply heat insulation to it without fail.

5.On drainage

Please install the drain hose so as to be downward slope without fail.

Please don't do the drainage as shown below.

Correct

Incorrect

Lean

Damage of flare

Crack

Partial

Too outside

Pipe diameter*

Size A (mm)

Liquid side

Gas side

6.35mm(1/4")

9.52mm(3/8")

0.8~1.5

1.0~1.5

A

Flare tooling die

Refrigerant piping work

Advertising
This manual is related to the following products: