Set Shims On Basehorse Locations

Locate basehorse positions along chalk
lines. Spot shim packs at each
basehorse location.

4

Level Floor. Use Laser Transit

Leveling is necessary to assure proper
case alignment. Locate highest point on
chalk line as reference for
determining height of shim-pack
levelers. A laser transit is recommend-
ed for precision.

7

Position Next Case In Line Up

Roll case approximately 6’ from adjoin-
ing case. Remove casters on the end
nearest to the next case. Allow casters
to remain on opposite end to assist in
pushing cases together - then remove
them.

6

LINE UP &

TRIM OUT

BASE RAIL

BASE RAIL

1

Consult With General Contractor

Ask the general contractor if there have
been changes in the building dimen-
sions since the print you are using was
issued. Also, ask the points of reference
from which you should take dimensions
to locate the cases.

2

Snap Chalk Lines

Mark floor where cases are to be
located for the entire lineup.

3

S n a p L i n e s O n B a s e R a i l
Locations
Snap lines where base rails are posi-
tioned, not the front or back edges of
the cases. See case cross section
drawing, page 3, for rail location dimen-
sions.

6

Position First Case In Lineup,
Remove Casters, Level
Roll first case into position. Raise case
from end under cross support using
“J” bar. Remove cotter pins, casters,
and outriggers. [CAUTION! Keep hands
from under case] Level case on shims.

Now that cases have been positioned and leveled, you may

proceed to trim-out case lineup. Trim parts have been

designed to be applied easily with only a small number of

fasteners required. Most external parts are adjustable to

achieve almost invisible, snug-fitting joints and a high level

of excellence in fit and finish.

Advertising