Hearth and Home Technologies BIR42-B User Manual

Page 30

Advertising
background image

30

G. Complete Installation

WARNING! Risk of Fire! You MUST maintain 2 in.

(51 mm) air space to insulation and other combustible ma-

terials around the chimney system. Failure to do so could

cause overheating and fire.
• Keep chimney sections from separating or twisting.

• You may secure straight chimney sections at the joints

with screws no longer than 1/2 in. (13 mm).

Figure 8.9 Ceiling/Attic Construction

H. Install Flashing

• Slip the flashing over the chimney.

• Nail the flashing to the roof. Keep gaps between flashing

plate and roof to a minimum.

NOTICE: Roofing shingles must be below the flashing

plate on the lower side of a sloped roof and over the

flashing plate on the sides and top.

• Caulk the flashing plate and roof junction as well as the

vertical seam on the flashing. All nail heads must be

caulked with a roofing sealant.

Heatilator • Birmingham BIR42-B • 4059-681C • 9/12

F. Cut Out Hole in Roof

• Refer to Figure 8.9.

• Plumb from roof to center of chimney.

• Drive a nail up through roof to mark center of pipe.

• Measure to either side of nail and mark the 17 in. x 17 in.

(432 mm x 432 mm) opening required.

• Measure opening on the horizontal; actual length may be

larger depending on roof pitch.

• Cut out and frame opening.

• Refer to

Chapter 25 of the Uniform Building Code for

roof framing details.

Advertising