Final assembly – Heath Zenith Motion Sensing Diecast Metal Lantern 9600LED series User Manual

Page 4

Advertising
background image

4

598-1338-03

FinaL assemBLy

1. Push the wires into the junction box. Make sure

none of the wires get pinched.

2. Slide the fixture assembly onto the mounting screws.

Tighten decorative nuts removed in step 1 of Instal-
lation
section securely against fixture base.

Junction Box

Mounting Screw

Decorative Nut

3. Caulk around fixture base with silicone weather

sealant.

4. Install the three LED Lamps (Lights of America

Model No. 2025LEDE12 included). Note: This
fixture’s E12 candelabra base uses either LED
Lamps (1.5W maximum each) or tungsten in-
candescent Type “B” bulbs (60 Watt maximum
each).

5. Insert threaded rod of finial through top cover. Slide

star washer onto rod and thread the nut onto the
rod. Tighten securely.

6. Place top cover onto fixture and attach using

the two decorative nuts (included). Hand tighten
only.

Top Cover

Decorative Nut

3 Light Bulbs
(60 Watt
Maximum each)

Fixture
Assembly

Finial

Star Washer

Nut

Advertising