Henny Penny OFE-341 User Manual

Page 3

Advertising
background image

Model OFE/OFG/OEA/OGA-341, 342



2-5. VENTILATION OF FRYER

(Continued)


When installing the gas fry station do not attach an

extension

to

the

gas

flue exhaust stack. This may impair

proper operation of the burner, causing malfunctions

and

possible

negative

back

draft.


2-6. GAS SUPPLY

The gas open fryer is factory available for either natural or

propane gas. Check the data plate inside the front door of the

cabinet to determine the proper gas supply requirements. The

minimum supply for natural gas is 7 inches water column, and 10

for

propane.




Do not attempt to use any gas other than that specified
on the data plate. Incorrect gas supply could cause a fire
or explosion resulting in severe injuries and/or property
damage.


Refer to the illustration on the following page for the

recommended hookup of the Open Fryer to the main gas line

supply.

To avoid possible serious personal injury:

Installation

must

conform with local, state, and national

codes.

• Installation must conform with American National

Standard Z223.1-Latest Edition National Fuel Gas Code

and the local municipal building codes. In Canada,

installation must be in accordance with Standards

CAN/CSA B 149.1 and 149.2, & Installation Codes - Gas

Burning Appliances and local codes. In Australia, in

accordance with Australian Gas Authority rules AG601-

2000,

section

AS5601.

• Isolate the fryer from the gas supply piping system by

closing its individual manual shut off valve during any

pressure testing of the gas supply piping system at test

pressures equal to or less than 1/2 PSIG (3.45 KPA)

(34.47

mbar).

• The appliance and its individual shutoff valve must be

disconnected from the gas supply system during any

pressure testing in excess or ½ psi (3.45 KPA).


2-3

903

Advertising