Transportation, installation – HSM FA 400.2 User Manual

Page 6

Advertising
background image

6

0702

FA 400.2

5. Transportation,

installation

• Place the shredder in its packaging on a smooth, level

surface.

• Remove the packaging.

• If you need to move the shredder through narrow

doors, you can wait until it is at its fi nal location before
fi tting the loading tray. Without the tray, the machine is
only 805 mm wide.

• When moving the shredder, note that it may topple

over.

• The shredder can be moved on its rollers.

If using a forklift to transport a Solo machine, you
must fi rst remove the waste trolley. Then you can
push the forks under the machine from the left or right
side and lift it up.

• The shredder may only be placed in dry rooms on a

hard, level fl oor – not on carpets. The fl oor load on
each roller is approximately 107 kg.

• Place the machine in such a way that the power plug

is easily accessible and the ventilation slots are free.

Solo machine:

- Lock the front castors by pressing down the brake
lever.

- Connect the power plug of the shredder to the 32A
CEE mains socket.

Combination version:

- Push the shredder up to the baling press until the
press and the outlet chute of the shredder touch.

- Bolt the shredder and the baling press together.

- Lock the front castors by pressing down the brake
lever.

- Connect the power plug of the shredder to the com-
bination socket of the baling press.

• The machine must be connected to a power source

which meets the specifi cations on the nameplate.

• Make sure the power cable is unobstructed and that

nobody can tread on it.

• No platforms or other raised surfaces may be placed

near the shredder if they encroach on the specifi ed
safety clearances.

• Fitting the loading tray:

Fasten the tray on both sides at the top with the Phil-
lips screws (1) and at the bottom with the 2 nuts (2).

1

2

Advertising