Mounting, 1 network sounder – Furuno ETR-30N User Manual

Page 19

Advertising
background image

1

1. MOUNTING

1.1 Network Sounder

1.1.1 Mounting considerations

The network sounder can be installed on the deck or on the bulkhead. When selecting a
mounting location, keep the following points in mind:

•

The temperature and humidity of the mounting location should be moderate and stable.

•

Locate the unit away from exhaust pipes and vents.

•

The mounting location should be well ventilated.

•

Do not install the equipment where it may get wet from rain or water splash.

•

Mount the unit where shock and vibration are minimal.

•

Keep the unit away from electromagnetic field-generating equipment such as motors and
generators.

•

Leave slack in cables for maintenance and servicing ease.

•

For mounting on a bulkhead, be sure the mounting location is strong enough to support
the weight of the unit (5.6 kg, 12.3 lbs) under the continued vibration normally
experienced onboard the vessel.

•

Observe the following compass safe distances to prevent disturbance to a magnetic
compass: standard compass, 1.7 m, steering compass, 1.1 m.

1.1.2 Mounting procedure

Fix the network sounder to the mounting location with four tapping screws (5

×

25,

supplied).

200

±

0.5

404

±

1

200

±

0.5

Mounting dimensions for the network sounder

Advertising