Cleaning and maintenance – FMI CGEF23B User Manual

Page 10

Advertising
background image

www.fmiproducts.com

120926-26C

10

REPLACING TRANSFORMER

1. Follow steps 1 through 3 under Replacing

Heater/Blower, page 9.

2. Disconnect transformer wires from control

board.

3. Remove screws from outside of firebox

surround to remove transformer (see

Figure 14).

4. Remove and discard transformer.
5. Place new transformer against inside

of firebox surround and replace screws

removed in step 3.

6. Reconnect transformer wires to control

board (see Wiring Diagram, page 12).

7. Replace top panel and screws.
8. Replace trim

Figure 14 - Removing Transformer

Transformer Screws

5. Reconnect wires to main control board

(see Wiring Diagram, page 12).

6. Replace top panel and screws.
7. Replace trim

Figure 16 - Replacing Settings Control

Board

Screws

Settings

Control Board

REPLACING MAIN CONTROL BOARD

1. Follow steps 1 through 3 under Replacing

Heater/Blower, page 9.

2. Disconnect wires to main control board.
3. Squeeze top of standoffs to remove main

control board and discard.

4. Gently push new control board onto

standoffs to install.

Figure 15 - Control Board

Main Control

Board

Standoffs

Transformer

Figure 13 - Removing Heater from

Blower

Heater

Blower

CLEANING AND MAINTENANCE

Continued

REPLACING SETTINGS CONTROL

BOARD

1. Follow steps 1 through 3 under Replacing

Heater/Blower, page 9.

2. Disconnect wires from main control

board.

3. Remove screws from bracket to remove

settings control board.

4. Place new settings control board into posi-

tion making sure each control is aligned

with slot in panel. Install using screws

from step 3. DO NOT overtighten. This

will damage control board.

5. Reconnect wires to main control board

(see Wiring Diagram, page 12).

6. Replace top panel and screws.
7. Replace trim

Advertising
This manual is related to the following products: