First Virtual Communications 065-7710 User Manual

Page 19

Advertising
background image

Signamax

065-7710 8-Port 10/100BaseT/TX + 2SFP Managed Switch

Publication date: January, 2006

Revision A1

11


TP Port and Cable Installation

⇒ In the switch, TP port supports MDI/MDI-X auto-crossover, so both types of

cable, straight-through (Cable pin-outs for RJ-45 jack 1, 2, 3, 6 to 1, 2, 3, 6 in
10/100M TP; 1, 2, 3, 4, 5, 6, 7, 8 to 1, 2, 3, 4, 5, 6, 7, 8 in Gigabit TP) and
crossed-over (Cable pin-outs for RJ-45 jack 1, 2, 3, 6 to 3, 6, 1, 2) can be used.
It means you do not have to tell from them, just plug it.

⇒ Use Cat. 5 grade RJ-45 TP cable to connect to a TP port of the switch and the

other end is connected to a network-aware device such as a workstation or a
server.

⇒ Repeat the above steps, as needed, for each RJ-45 port to be connected to a

Gigabit 10/100/1000 TP device.


Now, you can start having the switch in operation.

Power On

The switch supports 100-240 VAC, 50-60 Hz power supply. The power

supply will automatically convert the local AC power source to DC power. It does not
matter whether any connection plugged into the switch or not when power on, even
modules as well. After the power is on, all LED indicators will light up immediately
and then all off except the power LED still keeps on. This represents a reset of the
system.


Firmware Loading

After resetting, the bootloader will load the firmware into the memory. It will

take about 30 seconds, after that, the switch will flash all the LED once and
automatically performs self-test and is in ready state.

Advertising