Operation, Installation – FMI SVYD18NRA User Manual

Page 13

Advertising
background image

www.fmiproducts.com

113084-01L

13

INSTALLATION

Continued

PRESSURE TESTING HEATER GAS
CONNECTIONS
1. Open equipment shutoff valve (see Figure

11, page 12).

2. Open main gas valve located on or near

gas meter for natural gas or open pro-
pane/LP supply tank valve.

3. Make sure control knob of heater is in the

OFF position.

Figure 12 - Checking Gas Joints

(Oxford™ Stove Model Shown)

Control Valve Location

Propane/LP
Supply Tank

Equipment Shutoff Valve

Figure 13 - Checking Gas Joints

(Oxford™ Stove Model Shown)

Gas Meter

Equipment
Shutoff Valve

Control Valve Location

4. Check all joints from equipment shutoff

valve to control valve (see Figure 12 or
13). Apply a noncorrosive leak detection
fluid to gas joints. Bubbles forming show
a leak.

5. Correct all leaks at once.
6. Light heater (see Operation). Check all

other internal joints for leaks.

7. Turn off heater (see To Turn Off Gas to

Appliance, page 15).

Figure 14 - Assembling Rod and Screen

Rod

Rings

Slot on Inside
Left Front of
Stove

Figure 15 - Installing Screen Into Stove

(View From Back of Stove)

Hole on Inside
Right Front of
Stove

Rod with
Screen
Assembled

1. Insert rod through small rings located at

top of screen (see Figure 14).

2. From back of stove, insert rod into hole

located inside right front of stove as shown
in Figure 15, page 13.

INSTALLING ROD AND SCREEN

3. Slip left side of rod down into slot on

inside left front of stove (see Figure 15,
page 13).

Advertising
This manual is related to the following products: