PREPARE HOT WATER LINE

• The line may enter from either side, rear or floor within the

shaded area shown in Figure F.

• The line may pass through the same hole as the electrical

cable and drain hose. Or, cut an additional 1-1/2" diameter
hole to accommodate the water line. If power cord with plug
is used, water line must not pass through power cord hole.

Figure F

Water Line Connection

• Turn off the water supply.
• Install a hand shut-off valve in an accessible location, such

as under the sink. (Optional, but strongly recommended and
may be required by local codes.)

• Water connection is on the left side of the dishwasher. Install

the hot water inlet line, using no less than 3/8" copper tubing.
Route the line as shown in Figure F and extend forward at
least 19" from rear wall.

• Adjust water heater for 120°F to 150°F temperature.
• Flush water line to clean out debris.
• The hot water supply line pressure must be 20-120 PSI.

Turn page to begin dishwasher installation.

6"

661Dia56

5"

5"

4"

Cabinet Face

Shut-off

Valve

4"

2" From Floor

19" From Wall

2"

From

Cabinet

1-1/2" Dia.

Hole

Hot

Installation Preparation

5