Caution caution caution caution caution, Dishwasher installation, Important – GE GLD6500LWW/CC/BB User Manual

Page 6

Advertising
background image

Dishwasher Installation

Figure G

• Screw leveling legs back into the dishwasher frame,

approximately 1/8" from frame as shown.

756Dia39 923-10B

Approx.

1/8"

625Dia30

CAUTION

CAUTION

CAUTION

CAUTION

CAUTION

Do not remove wood base until you are

ready to install the dishwasher. The dishwasher will

tip over when the door is opened if base is removed.

STEP 3: REMOVE WOOD BASE,

INSTALL LEVELING LEGS

IMPORTANT

Do not kick off wood base!

Damage will occur.

• Move the dishwasher close to the installation location and lay

it on its back.

• Remove the four leveling legs on the underside of the wood

base with a 15/16" socket wrench.

• Discard base.

STEP 2: CHECK DOOR BALANCE

• With dishwasher on the wood base, check the door balance

by opening and closing the door.

• Door is properly balanced if it gently drops from a 1/2 open

position and does not rise from the full open position.

• If necessary increase or decrease tension

as shown. Latch door and adjust both springs
to the same tension setting to correct balance.

Tip: Make sure door opens and closes smoothly
Check door opening and closing. If door does not open easily
or falls too quickly, check spring cable routing. The cable is held
in place by “shoulders” on the pulley. Check to be sure cable
has not slipped over the pulley shoulders.

Increase

Spring

Tension

Decrease

Spring

Tension

Correct

Incorrect

Insert Hook

Over Bracket

05A-1182N

STEP 1: PREPARATION

Locate the items in the installation package and set aside for
use in the listed steps:
• Screw kit – Steps 5 or 18 and 15
• Junction box cover – Step 5 or 18
• Drain hose and clamp – Step 7
• Drain hose hanger – Step 17
• Trim pieces (some models) – Step 11
• Owner's Manual - Steps 19 and 22
• Product Samples and/or coupons – Step 22

Figure H

To

ekick

Remove 2

Toekick Screws

923-02P

STEP 4: REMOVE TOEKICK

• Remove the 2 toekick screws and toekick. Set aside for use in

Step 21.

Figure I

6

Advertising