Pg. 3, Installation instructions for, Nv-45 w/horizontal discharge – Greenheck Fan Outdoor Air Ventilator User Manual

Page 3: Step 1 mounting the unit, Step 2 attach ductwork to unit discharge, Step 3 attach ductwork to unit intake, Typical installations

Advertising
background image

INTAKE

DISCHARGE

DISCHARGE

INTAKE

C

L

C

L

Equipment
Support
Footprint

C

L

A

A

(fig.4)
Roof mounted arrangement HZ
with weatherhood, mounted on three equipment supports.
Ductwork is attached to discharge collar with rubber
boot transition.

(fig.5)
Arrangement HZ shown as an indoor
hanging installation with intake and
discharge ductwork installed.
(Hanging support structure for unit is by others).

(fig.2)

(fig.3)

Step 1 Mounting the Unit

Arrangement HZ can be mounted on a curb
with an equipment support (see curb inst.) or
on three equipment supports (figs. 1&4).

Arrangement HZ can also be used for indoor
applications mounted hanging (fig. 5), inline
as part of an air handling system, or base
mounted. Mounting hardware to be provided
by others.

In any case, adequate support of the unit is
required.

Step 2 Attach Ductwork to Unit Discharge

Chart and drawing (fig.2) below shows opening size (ID)
and location for a discharge collar. Also included is the
recommended straight duct length for optimal
performance. Greenheck recommends attaching
ductwork to collar using a rubber duct section at the
unit to eliminate vibration.

Step 3 Attach Ductwork to Unit Intake

For non-weatherhood installations, fig. 3 below shows
dimensions for supply opening (ID). Attach ductwork to
perimeter flange using a rubber duct section at the unit
to eliminate vibration. Design the remaining ductwork
for minimal losses to allow the unit to operate properly.

A -Equip. Support

CL

44

1

/

4

"

(fig.1)

Typical Installations

3

Recommended Duct Size/Location
and Intake Dimensions

Minimum Straight Duct Length - 54”

16

16

48

43

12

23

Installation Instructions for:

NV-45 w/Horizontal Discharge