1. Unpack the hood and lay it on the lifting skid.
2. Bolt the filler panels together with 5/16 in. bolts

provided in the hardware package.

3. Position the filler panels to the hood back, and

tack-weld them into place.

4. To allow for ease of cleaning, caulk the external

seams with NSF Approved silicone caulk
(GE SCS1000, or its equivalent). The caulk is not
provided.

After the hood is secured, make the exhaust duct
connections. The fire system distributor must be
contacted at this time. After the fire system has been
installed, mount the enclosures, then the supply
plenums. If an Horizontal Supply Plenum is provided,
it should be installed before the enclosures. The hood
and accessories are now installed.
Finally, make the electrical connections from the
controls to the fans and complete the fire system
circuits as required by the job specification (job
specific wiring diagram located inside the cabinet
cover).

Installation Overview

NOTE

If you have a Back Supply Plenum (BSP), this must
be installed before the hood. Refer to page 11 for
instructions on installing the BSP.

NOTE

All hanger brackets must be used and the hood
must be properly supported while lifting to prevent
damage or distortion to the hood. The hood must be
hung level to operate properly.