Step 1: select a location for the gmi 10, Step 2: flush mounting the gmi 10 – Garmin GMI 10 User Manual
Page 2
GMI 10 Installation Instructions
Step 1: Select a Location for the GMI 10
Consider the following when you select an installation location:
Provides optimal viewing as you operate your vessel.
Allows easy access to the keypad on the GMI 10.
Is strong enough to support the weight of the GMI 10 and protect it from excessive vibration or shock.
Allows room for the routing and connection of the cables. There should be at least a 3 inch (8 cm) clearance behind
the case.
Is at least 9
1
/
2
in. (241 mm) from a magnetic compass, to avoid interference.
Mount the GMI 10 in an area that is not exposed to extreme temperature conditions.
NOTE: The temperature range for the GMI 10 is from 5°F to 158°F (from -15°C to 70°C). Extended exposure to
temperatures outside this range (in storage or operating conditions) may cause failure of the LCD screen or other
components. This type of failure and related consequences are not covered by the manufacturer’s limited warranty.
Step 2: Flush Mounting the GMI 10
In addition to four of the included mounting screws (number 8 ANSI (4.2 × 1.4 DIN7981)), flush mounting the GMI 10
requires the following tools:
Phillips screwdriver
Drill and
1
/
8
in. (3.2 mm) drill bit for mounting holes
3
17
/
32
in. (90 mm) hole saw for pilot hole
Scissors
Center punch and hammer
File and sandpaper
Anti-seize lubricant (optional)
Counterbore bit (for fiberglass installations)
NOTE: Ensure that the surface on which you mount the GMI 10 has sufficient open space behind it to accommodate
the GMI 10 and the connected wires.
To flush mount the GMI 10:
1. The flush-mount template is included in the product box. Trim the template
and ensure that it will fit in the location at which you want to flush mount the
GMI 10.
2. The flush-mount template has adhesive on the back. Remove the protective
liner and apply the template to the location where you want to flush mount
the GMI 10.
3. Using the 3
17
/
32
in. (90 mm) hole saw, cut the mounting surface along the
inside of the dashed line indicated on the flush-mount template. Use a file
and sandpaper to refine the size of the hole.
4. Place the GMI 10 into the cutout to confirm that the four mounting-holes are
correct after refining the hole. If not, mark the correct locations of the four
mounting holes. Remove the GMI 10 from the cutout.
5. Using the center punch, indent the center of each of the four mounting-hole locations.
6. Using a
1
/
8
in. (3.2 mm) drill bit, drill the four mounting holes.
NOTE: If you are mounting the chartplotter in fiberglass, it is recommended to use a countersink bit to drill a
clearance-counterbore through only the top gel-coat layer. This will help to avoid any cracking in the gel-coat layer
when the screws are tightened.
•
•
•
•
•
•
•
•
•
•
•
•
•
•