Installation instructions – GE 23 User Manual

Page 25

Advertising
background image

25

Installation Instructions

REPLACE THE BASE GRILLE

Replace the grille by installing the two
Phillips head screws.

7

SET THE CONTROLS

Set the controls to the recommended
setting.

8

START THE ICEMAKER

Set the icemaker power switch to the
I (on) position. The icemaker will not
begin to operate until it reaches its
operating temperature of 15°F (–9°C)
or below. It will then begin operation
automatically. It will take 2–3 days to
fill the ice bin.

NOTE:
In lower water pressure conditions, the
water valve may turn on up to 3 times
to deliver enough water to the icemaker.

9

Power
switch

Advertising