Remove packaging, check contents, Installation preparation, Remove the packaging – GE Monogram ZV750 User Manual

Page 5

Advertising
background image

Installation Preparation

5

Check Installation Hardware

Locate the hardware accessory box packed with the
hood and check contents.

REMOVE THE PACKAGING

The vent hood is shipped secured to a shipping
board with 4 screws.
• Remove the duct cover, parts box and styrofoam

packaging.

• Lift the hood out of the box, using hand grips on

both sides of the shipping board.

• Remove and properly discard the plastic wrapping.

• Locate and remove 2 screws at the top of the

assembly and 2 screws inside the hood behind the
filter guides on the left and right sides. Discard the
shipping board.

• Remove junction box cover.
• Remove knockout from junction box.
• Install strain relief onto junction box.

Check contents of the required accessory,
ZXR758 or ZXR7510.

Mounting Screw

Shipping Board

2 Large

Flat Washers

2 Phillips Head

Decorative Screws

3 Stainless

Steel Grease

Filters

10 Wood

Screws

2 Side Bars with 4 Machine Screws

Wall Mount Template

2 Mounting Brackets

Duct Cover Bracket

(not required for

recirculating operation)

10 Metal Wall

Fasteners

Decorative

Duct

Covers

• Drill 1/8" Pilot Holes For Mounting Brackets.

Align edge 25-1/2" above Cooking Surface.

17-5/16"

3-15/16"

13-9/16"

2-5/32"

C

L

C

L

C

L

• Drill 1/8" Pilot Holes.

• Drill 1/8" Pilot Holes.

26-14" to 8 ft. Ceiling

38-1/4" to 9 ft. Ceiling

38-1/4" to 50-1/4" For

9ft. to 10 ft. Ceiling

Using Optional Accessory

ZX10SY Duct Cover

5-7/8"

2 Wood
Screws

2 Plastic

Wall Fasteners

Air Deflector with

Upper Duct

Connector

Recirculating

Decorative
Duct Cover

Mounting

Screw

Shipping Board

Mounting

Screw

Knockout

Junction

Box

3 Charcoal Filters

2 Phillips Head

Decorative Screws

Advertising