Step 1, determine installation location, Step 2, install mouning brackets, Installation instructions – GE Monogram ZV750 User Manual

Page 6: 1 determine installation location, 2 install mounting brackets

Advertising
background image

Installation Instructions

6

1 DETERMINE INSTALLATION

LOCATION

To determine the exact location of the vent hood.

• Locate the template packed with the literature.

– Measure 36" from the floor to the top of the

cooking surface. Add 25-1/2" recommended
space from the cooking surface to the bottom
of hood. Mark that location.

– Use a level to draw a straight pencil line on the

wall.

– Tape the template in position along the penciled

line. CHECK TO BE SURE THE TEMPLATE IS
LEVEL.

– Measure from the peak of the hood to the ceiling

as indicated.

2 INSTALL MOUNTING BRACKETS

Whenever possible, the vent hood should be secured to wall
studs.

• With the template taped in place, use a punch to

mark all mounting screw locations.

• Drill 1/8" pilot holes at the 6 punched locations.
• Remove the template.
• Enlarge holes that did not enter studs to 3/8" and

tap anchors for metal wall fasteners into the holes.
– Drive screws into the fasteners to allow anchors to

expand against the wall material. Remove the
screws for final installation.

• Secure the mounting brackets to the wall studs with

wood screws provided.
– For hollow walls, secure the mounting brackets

through the anchors.

For ZXR758 –
26-1/4" to 38-1/2" for 8 ft. to 9 ft. ceilings.
For ZXR7510

38-1/4" to 50-1/4" for 9 ft. to 10 ft. ceilings.
• Use a level to draw a line straight up, from the

centerline on the template to the ceiling.

House Wiring Locations

• The junction box is located on the top of the

hood, at the front right side.

• Route house wiring as close to the installation

location as possible; through the ceiling, soffit or
back wall. Wiring should enter at least 4" above
the bracket on the right side.

Note: Screws “A” and
“B” are pre-assembled
onto the brackets. Do
not remove these
screws.

Screws

“B”

Screws

“A”

• Drill 1/8" Pilot Holes For Mounting Brackets.

Ceiling

Align edge 25-1/2" above Cooking Surface.

17-5/16"

3-15/16"

13-9/16"

2-5/32"

C

L

• Drill 1/8" Pilot Holes.

• Drill 1/8" Pilot Holes.

26-14" to 8 ft. Ceiling

38-1/4" to 9 ft. Ceiling

38-1/4" to 50-1/4" For

9ft. to 10 ft. Ceiling

Using Optional Accessory

ZX10SY Duct Cover

5-7/8"

Advertising