Through-the-wall installation—optional, Installation instructions, Installing through the wall – GE 10 DCB User Manual

Page 13: Prepare opening in wall, Support requirements for air conditioner

Advertising
background image

13

Installation Instructions

PREPARE OPENING IN WALL

Make certain a wall receptacle is
available close to the hole location or make
arrangements to install a receptacle.

The cord length for the 115-volt models is 72

to the right and 47

″ to the left.

For the 230/208-volt models the cord length is
65

″ to the right and 39″ to the left.

1

INSTALLING THROUGH THE WALL

Read these instructions completely and carefully.

SUPPORT REQUIREMENTS FOR
AIR CONDITIONER

The air conditioner wall case may be installed
with 1/4

″ min. extension out from the inside

wall or with 1/4

″ min. extension out from the

outside wall.

The finished sides of the opening should be
structural wall members.

Lintel – Use a lintel in brick veneer and brick
and block types of wall to support the bricks
or blocks above the opening. Do not allow the
wall case to be used in lieu of a lintel.

Flashing – Install flashing (drip rail) as shown
to prevent water from dripping inside the wall
and down the outside of the building.

2

Trim
molding
(if desired)

Plaster
line

Caulking
(above &
below
the
flashing)

Flashing

(drip rail)

1/4

″ min. extension

inside the wall from

the trim molding

Room side

Brick veneer

Lintel angle
(if required)

Caulking

(on all 4

sides on the

outside of

the case)

SUPPORT REQUIREMENTS FOR
AIR CONDITIONER

Mortar between the case and the brick all
around the case may be undercut at about 45°
for improved caulking.

3

Caulking

Top of case

Inside

Outside

Undercut
mortar

Advertising
This manual is related to the following products: