Horizontal venting, Vertical venting – GE JV376 User Manual

Page 3

Advertising
background image

3

HORIZONTAL VENTING

(If the wall cap has a damper, do not install the
damper blade on the hood.)
Attach the damper with the small sheet metal
screws (#8 x 1/4

).

Check the damper
for free operation.
Open the damper
blade to
approximately 80
degrees.
Position the blower for horizontal discharge. The
air flow arrow on the blower should point to the
rear vent opening.

When the blower is in position, snap the blower
retainer bar toward the front into the indent.
Reattach the plug into the junction box.

8. Lift the hood into position and feed the house
wiring through the wiring knockout.
Slide the hood back against the wall.
Tighten the mounting screws. Be sure the screw
heads are in the narrow neck of the keyhole slot.
9. Complete the electrical wiring in the wiring
box according to National Electrical Code and
local codes.
NOTE: This hood must be permanently
grounded.
10. Replace the junction box cover and blower
assembly.
Reattach the plug into the junction box.
Install light bulbs (not supplied with the hood).
Reattach bottom motor/light cover and filters.
11. Installation is complete. Turn on the power.

VERTICAL VENTING

(If the roof cap has a damper, do not install the
damper blade on the hood.)
Attach the damper with the small sheet metal
screws (#8 x 1/4

).

Check the damper
for free operation.
Open the damper
blade to
approximately 80
degrees.
Position the blower for vertical discharge. The
air flow arrow on the blower should point up
towards the vent opening.

When the blower is in position, snap the blower
retainer bar toward the front into the indent.
Reattach the plug into the junction box.

Blower discharge

Air flow arrow

This surface
to rear

3

5

Damper blade
to front

This surface to top

Blower
discharge

3

5

Air flow arrow

Damper

blade to top

Damper

4. Use the hood as a template. Mark the
locations on the cabinet or wall for ductwork,
electrical wiring and keyhole screw slots.
Cut holes at marked locations for duct and
electrical wiring. For the vertical duct, cut out 3/4

extra toward the front of the cabinet for movement
of the duct when installing the hood.
5. Run the electrical wires through the wall or
cabinet according to National Electrical Code
and applicable local codes.
NOTE: DO NOT turn the power on until
installation is complete.
6. Drive the screw partway
into the center of the
narrow neck of the keyhole
slots marked on the
cabinets.
7. Follow the directions for vertical or
horizontal venting.
NOTE: If the venting installation is NOT
correct, the blower will run at maximum RPM
regardless of the speed control setting.
When installing the blower housing, be
sure wires cannot contact the blower wheel.

Keyhole slot
in canopy

Screw

(supplied)

Damper

Advertising