Voyager 3, Operations manual: installation, 2004 general binding corporation – GBC VOYAGER 3 930-032 User Manual

Page 27: Gbc films group

Advertising
background image

Operations Manual: Installation

Voyager 3

Voyager 3

2004 General Binding Corporation

Page 4-3

Figure 4.1.1 Suggested Floor Layout

MANUF

A

C

TURE OR FOR ANY O

T

HER PURPOSE

WITHOUT

WRITTEN

COPIED OR DISCLOSED IN

WHOLE OR IN P

A

R

T

, OR USED FOR

FOR ENGINEERING INFORMA

TION ONL

Y

AND SHALL NO

T BE

REPR

ODUCED

,

GBC PR

O-TECH CLAIMS PR

OPRIET

AR

Y RIGHTS

T

O

THE

MA

TERIAL DISCLOSED ON

THIS DRA

W

ING.

IT IS ISSUED IN CONFIDENCE

PERMISSION FR

OM GBC PR

O-TECH

PR

OPRIET

A

R

Y

C

GBC Films Group

4151 Ander

s

on Road,

DeForest,

WI 53532

This print is the pr

oper

ty of GBC Films Gr

oup.

The inf

ormation thereon is remitted in confidence

.

UNLESS O

THER

WISE SPECIFIED

T

O

LERANCE

DIM.

AS

SHO

WN

TO

L

.

+

1/64

+

.050

+

.020

+

.010

+ .005

X/X

X

XX

XXX

XXXX

ANGLES

+ 1D

FINISH

TO

B

E

125

TITLE :

D

A

TE :

D

RA

WN BY :

D

WG SCALE :

D

WG :

REVISION

CHECKED BY : GBC FILMS GR

OUP

Sug

g

ested Floor La

y

out

GBC V

o

y

a

g

e

r

3

Figure 4.1.1

N/A

SNF

10/31/02

> 2 ft.

(61 cm)

> 5 ft.

(152 cm)

> 2 ft.

(61 cm)

> 5 ft.

(152 cm)

16 ft.

(488 cm)

Detail A-A

Align heater with

edge of feeder motor

Air supply drop

Electrical drop

(Laminator)

W

a

ter supply drop

4 ft.

(122 cm)

3.5 ft.

(107 cm)

6 ft.

(183 cm)

Electrical (Europe):

- 400 V

a

c

- 50 hz

- 75 amps

- 3 phase (four wire)

Air:

- 8 Bar Max

(1

12 psi / 800 MPa)

- 10-12 CFM

(280-360 liters/ min.)

Wa

te

r:

(Recommended)

- T

a

p

water

- Drain return

Laminator Requirements

Electrical (US):

- 230 to 400 V

a

c

- 60 hz

- 100 amps

- 3 phase (four wire)

T

ransformer Required

- 230 to 400 V

a

c

- 3 phase (four wire)

Heater Requirements

See Heater Manual For

Details.

Electrical drop

(Heater)

Advertising