Entelli-switch 250 controller – GE ZBTSD User Manual

Page 8

Advertising
background image

6

GE Zenith Controls

ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

Entelli-Switch 250 Controller

Entelli-Switch 250 Controller

Consists of two major assemblies:

I.

The Microprocessor contains the following:

A.

Entelli-Switch 250 Board - Customer Input
and Output (I/O) for system interface. Located
on the left hand side of the back of the unit
(see figure 7)

1.

I/O accessories that can be found here are:
a.

Engine start relay P output

b.

Pre-Signal to transfer T3, W3 and
UMD output (optional)

c.

Transfer Inhibit Q3 and Q7 input
(optional)

d.

Remote test Q2 input (optional)

e.

Network interface ZNET
input/output (optional)

B.

LCD and Keypad located on the exterior
of the door (see figure 8)

1.

User accessibility to the following:
a.

LED indication of source
availability

b.

LED indication of transfer
switch position

c.

LCD screen indicates:
(1) timer count down (numeric)
(2) event reporting (text)

d.

Keypad provides user interface to:
[in conjunction with LCD screen]
(1) Setting sensors and timers
(2) Configuring logic accessories

II.

The Controls Power Supply (CPS)

Contains transformers which drop line voltage
to control level for controller input and SCR
inputs (see figure 7).

Figure 7

Figure 8

I/O Interface

CPS

Engine Start Relay P

Battery Strip

and

Access

Code Label

Entelli-Switch 250

Board

S 1 O K

2 1 : 5 6

M O N 2 3 A P R 2 0 0 2

M O R E

T E S T

Advertising
This manual is related to the following products: