Installation instructions, Tools you will need, Plan the installation – GE JV396 User Manual

Page 4: Install the hood, 4installation instructions

Advertising
background image

4

INSTALLATION INSTRUCTIONS

This hood can easily be installed by following these

basic steps:
• Mark and cut out the cabinet bottom.
• Secure the hood to the cabinet.
• Mount the cabinet on the wall.
• Connect the ductwork and the power cable.

TOOLS YOU WILL NEED

Flat blade and Phillips

screwdrivers

Pencil

Duct tape

Saw (saber or keyhole)

Electric Drill

Metal Snips

(in some applications)

Pliers

Tape measure

Wire stripper

Flashlight

Caulking

Level

PLAN THE INSTALLATION

Caution: Remove the house fuse or open the
circuit breaker before beginning the installation.
Your new hood will fit a standard 30

″ wide flush bottom

or recessed bottom, framed or frameless kitchen cabinet
which has a minimum depth of 11

from the face to

the inside of the back wall.
The unit is ducted vertically. To change to horizontal

ducting see the instructions.
For safe operation, the mounted hood must be a

minimum of 18

″ above the cooking surface.

For easiest installation, the range hood should be

installed in the cabinet before mounting the cabinet to

the wall.
NOTE: Remove the glass visor from the unit before

installing the hood in the cabinet to protect the visor

from damage.

INSTALL THE HOOD

1. Mark and cut out the cabinet bottom.

Prepare the cabinet bottom as shown above. Be sure
to locate the cut-out and four holes from the front of
the cabinet to assure a flush mount.

Advertising
This manual is related to the following products: