Installation checklist – GE AP12170-4 User Manual

Page 11

Advertising
background image

11

Safety Instructions

Installation Instructions

Operating Instructions

Care and Cleaning

T

roubleshooting Tips

Customer Service

Installation checklist.

Water Heater Location

■

Close to area of heated water
demand.

■

Indoors and protected from
freezing temperatures.

■

Area free of flammable vapors.

■

Sufficient fresh air supply for
proper operation of water heater.

■

Provisions made to protect area
from water damage.

■

Sufficient room to service heater.

Water Supply

■

Water heater completely filled
with water.

■

Air purged from water heater and
piping.

■

Water connections tight and
free of leaks.

Relief Valve

■

Temperature and Pressure Relief
Valve properly installed and
discharge line run to open drain.

■

Discharge line protected from
freezing.

Wiring

■

Power supply voltage agrees with
water heater rating plate.

■

Branch circuit wire and fusing or
circuit breaker of proper size.

■

Electrical connections tight and
unit properly grounded.

Advertising
This manual is related to the following products: