PLANNING FOR PLUMBING

(shown with optional pipe cover)

The center of the pipes can be placed anywhere
within the shaded area. The center of the pipes
is recommended to be protruding only within 6″
of the mounting wall. Other specific installations
may be different.

Be sure that the minimum elevation of the bottom
of the unit is 18″ to meet the 36″ recommended
clearance for the exhaust.

CAUTION:

BURN HAZARD. Hot exhaust and

vent may cause serious burns. Keep back from water
heater unit. Keep small children and animals away
from unit.

CAUTION:

Hot Water outlet pipes leaving unit

can be hot to touch. Insulation must be used for hot
water pipes below 36″ due to burn risk to children.

NOTE: It is recommended to install the bottom
of the unit at least 18″ off the ground to minimize
blockage and maintenance from debris and provide
room for the optional Pipe Cover Accessory Model
Number AGTPCM.

NOTE: Do not install electrical outlet directly
below unit. Electrical outlet must be installed
less than 6 feet from unit.

36″ min.

Water and gas
through the wall

*

Unit

12″

2

1

2

2

1

2

2

1

2

4

1

2

6

1

2

18″ min.

Ground

7″

9″

3

3

8

9

7

8

Optional Pipe Cover (AGTPCM)
shown shaded.

Pipe cover not required, However,
consideration should be taken in the
design of the rough plumbing to allow
installation of unit and pipe cover

*

Suggested area for Water and Gas lines to come

through the wall to allow the optional pipe cover
to be installed if desired.