Step 5, install duct transition and damper, Step 6, install hood to support, Step 7, connect duct – GE Island Vent Hood ZV421 ZV541 User Manual
Page 15: Installation instructions
15
Installation Instructions
STEP 5 INSTALL DUCT TRANSITION
WITH DAMPER
IMPORTANT: Remove shipping tape from damper and
check that damper moves freely.
• Place the transition piece over the hood exhaust and
secure with 4 Screws C provided.
• Use duct tape to seal the connection. Check to be
sure the damper moves freely.
STEP 6 INSTALL HOOD
Note: THREE PEOPLE ARE REQUIRED TO
COMPLETE THIS INSTALLATION!
• Back out the hanging screws on the bottom of the
support frame to a 1/4" gap.
• Lift the hood up to the support frame. Carefully align
the hood keyhole to the screws on the support frame.
Slide the hood to engage the keyhole slots.
• Tighten the screws.
Slide Duct
Collar Down
to Cover Gap
Duct
Transition
Bumper Pads
Attachment
Screws
Attachment
Keyholes
1/4" Gap
Install
2 Safety
Screws