GENERATOR SHUT-DOWN PROCEDURES

NORMAL SHUTDOWN PROCEDURE

To shutdown the generator, use the following procedure:

1. Place both the MAIN, GFCI and LOAD circuit breakers

as shown in Figure 56 to the OFF position..

Figure 56. Main, GFCI and Load

Circuit Breakers Off

2. Place the engine speed switch (Figure 57) in the “LOW

(down) position..

Figure 57. Ignition Switch (Normal)

3. Let the engine cool by running it at low speed for 3-5

minutes with no load applied.

4. Place

the

MPEC Control Switch (Figure 58) to the

OFF/RESET position.

Figure 58. MPEC Control Switch (Off/Reset)

5. Verify

that

all status LEDs on the MPEC display are

OFF (not lit).

6. Remove all loads from the generator.

7. Inspect entire generator for any damage or loosening of

components that may have occurred during operation.

EMERGENCY SHUTDOWN PROCEDURE

1. Place

the

MPEC Control Switch (Figure 58) in the

OFF/RESET position.

1. Perform steps 1 through 5 in the Before Starting section

as outlined in the Manual Starting Procedure.

2. Place

the

engine speed switch (Figure 54) in the

HIGH position

Figure 54. Engine Speed Switch (High)

3. Place

the

MPEC Control Switch (Figure 55) in the

AUTO position.

Figure 55. MPEC Control Switch (AUTO)

4. Continue operating the generator as outlined in the

Manual Start-up procedure (start at step 5)