5. connecting work clamp and gas/air supply, 6. connecting input power – Miller Electric 188 036G User Manual

Page 15

Advertising
background image

OM-2219 Page 11

2-5.

Connecting Work Clamp And Gas/Air Supply

Ref. 801 977-A

1

Work Clamp

2

Workpiece

Work clamp cable is attached to
front of unit. Connect work clamp to
a clean, paint-free location on work-
piece, as close to cutting area as
possible.

.

Use only clean, dry air with 90
to 150 psi pressure.

3

Gas/Air Inlet Opening

4

Hose

5

Teflon Tape

Obtain hose with 1/4 NPT right-
hand thread fitting. Wrap threads
with teflon tape (optional) or apply
pipe sealant, and install fitting in
opening. Route hose to gas/air
supply.

Adjust gas/air pressure according
to Section 3-2.

Tools Needed:

5/8, 1-1/8 in

3

1

2

4

5

From Gas/Air Supply

2-6.

Connecting Input Power

Do not attempt to connect this unit to anything other than a
Miller engine-driven welding generator with the proper
receptacle installed.

1

Spectrum Lynx

2

Power Plug

3

Engine-Driven Welding
Generator With Required
Receptacle Installed

4

AC Power Receptacle For
Lynx

Connect power plug to proper re-
ceptacle on engine-driven welding
generator.

1

801 977-A / Ref. ST-802 200

Rear of Unit

2

3

4

Example Welding

Generator

Advertising
This manual is related to the following products: