Manitowoc Ice Chiplet QC0700 User Manual

Page 29

Advertising
background image

Section 2

Installation Instructions

Part Number 000002688

2-19

Suction Shut Off Valve Insulation

The pre-formed suction shut-off valve insulation is
located in the plastic bag taped to the water curtain.

A. Verify valve and schrader caps are tightened to

specifications (see Step 6).

B. Place insulation over schrader valve cap and left

side of valve. Position the tab between the
mounting bracket and rear panel.

C. Fold insulation and hold against right hand side

of valve while securing with electrical tape. Seal
the line set insulation to the shut off valve
insulation with electrical tape.

PRE-FORMED

INSULATION

SV3084

TIGHTEN VALVE CAPS

TO SPECIFICATIONS

SV3085

PLACE TAB BETWEEN

VALVE BODY AND PANEL

SV3086

FOLD INSULATION OVER

RIGHT SIDE OF VALVE AND

SECURE WITH

ELECTRICAL TAPE

Advertising
This manual is related to the following products: