Manitowoc Ice Chiplet QC0700 User Manual

Page 46

Advertising
background image

Ice Machine Operation

Section 3

3-14

Part Number 000002688

Water Reservoir Removal

1. Place the toggle switch in the OFF position and turn

off the water supply to the ice machine at the water
service valve.

2. Disconnect water supply line at float valve quick

disconnect by depressing stainless steel lever.

3. Place the toggle switch in the ICE position. The dump

valve will open and the float reservoir will empty.

4. After the reservoir is empty, place the toggle switch

in the OFF position and disconnect power to the ice
machine at the service disconnect.

5. Remove water float valve coil.

A. Depress coil and rotate 1/4 turn

counterclockwise.

B. With coil wires attached, lift coil off enclosure

tube.

5. QF0800/QC0700 ONLY Rotate quarter turn

fasteners counterclockwise.

6. QF0800/QC0700 ONLY Remove cotter key and pin

from ice chute.

7. Remove top cover from float reservoir.

8. Lift float valve out of float reservoir.

9. Disconnect the drain lines from reservoir.

10. Lift reservoir off of evaporator assembly.

QC700/QF800 Shown

Ice Diverter Removal

QF0400

1. Place the toggle switch in the OFF position, turn off the

water supply and disconnect electrical power to the ice
machine.

2. Remove thumbscrews and lift panel forward.

3. Remove bin level sensor from white plastic panel.

4. Remove ice diverter from bin.

5. When the bin level sensor is reinstalled the correct position

is 4.5” (114 mm) from the left edge of the white panel.

WATER

RESERVOIR

EVAPORATOR

ASSEMBLY

SV2024

3

2

SV2052

LOCATE BIN LEVEL SENSOR 4.5”
FROM EDGE OF WHITE PANEL