Air-cooled baffle – Manitowoc Ice S User Manual

Page 22

Advertising
background image

Installation Instructions

Section 2

2-10

Part Number 000000966

Removing Drain Plug and Leveling the Ice
Storage Bin

1. Remove threaded plug from drain fitting.

2. Screw the leveling legs onto the bottom of the bin.

3. Screw the foot of each leg in as far as possible.

4. Move the bin into its final position.

5. Level the bin to assure that the bin door closes and

seals properly. Use a level on top of the bin. Turn the
base of each foot as necessary to level the bin.

6. Inspect bin gasket prior to ice machine installation.

(Manitowoc bins come with a closed cell foam
gasket installed along the top surface of the bin.)

7. Remove all panels from ice machine before lifting.

Remove both front panels, top cover, left and right
side panels.

8. Install ice machine on bin.

Leveling Leg and Foot

Air-Cooled Baffle

SELF-CONTAINED AIR-COOLED ONLY

The air-cooled baffle prevents condenser air from
recirculating. To install:

1. Remove the back panel screws next to the

condenser.

2. Align the mounting holes in the air baffle with the

screw holes and reinstall the screws.

Air Baffle

! Caution

The legs must be screwed in tightly to prevent them
from bending.

SV1606

THREAD LEVELING
LEG INTO BASE OF

CABINET

SV1607

AIR

BAFFLE

SCREWS

Advertising