Summary of installation tasks, Task 1: verify installation requirements, Installation task summary -2 – McDATA 4300 User Manual

Page 36

Advertising
background image

2

2-2

McDATA Sphereon 4300 Fabric Switch Installation and Service Manual

Installation Tasks

Summary of Installation Tasks

Table 2-2

summarizes installation tasks for the product. The table

describes each task, states if the task is optional, and lists the page
reference.

Task 1: Verify Installation Requirements

Verify the following requirements are met prior to product and
management interface installation. Ensure:

A site plan is prepared, configuration planning tasks are
complete, planning considerations are evaluated, and related
planning checklists are complete. Refer to McDATA Products in a
SAN Environment - Planning Manual
(620-000124) for information.

Fibre Channel SAN design and director, fabric switch, and SAN
router device connectivity are evaluated, and the related planning
worksheet is complete. Refer to the McDATA Products in a SAN
Environment - Planning Manual
(620-000124) for information.

Table 2-2

Installation Task Summary

Task Number and Description

Required or Optional

Page

Task 1: Verify Installation Requirements.

Required.

2-2

Task 2: Unpack, Inspect, and Install the Product.

Required.

2-3

Task 3: Configure Product at the EFCM Basic Edition
Interface
.

Required.

2-6

Task 4: Configure Product Network Information (Optional).

Configure if connecting multiple switches or connecting
switch to a public LAN.

2-23

Task 5: Cable Fibre Channel Ports.

Required.

2-26

Task 6: Configure Zoning (Optional).

Perform task to configure zoning.

2-26

Task 7: Connect Product to a Fabric Element (Optional).

Perform task to connect switch to a Fibre channel
fabric.

2-27

Task 8: Register with the McDATA File Center.

Required.

2-28

Advertising